In the Pipeline
Hyatt Regency Hotel
Westlake Village, CACSA Architects
The Project includes a feasibility report relating to the existing mechanical and plumbing infrastructure. The findings from that report will become the basis for the proposed mechanical and plumbing systems for the Phase I Guestroom Tower with 68 keys.

Sand & Surf Resort Hotel
Laguna Beach, CAW A T G
The Hotel property was designed and operated as a non-air-conditioned resort providing only electric heating for the guest suites. The proposed mechanical infrastructure will be water-cooled Variable Refrigerant Flow heating and cooling fan coil units. Learn More.

Hampton Inn & Suites Hotel
Los Angeles, CAAXIS/GFA Architecture + Design
This project was designed in 2014 and shelved until now 2022. The challenge will be to re-certify California Administration Code Title 24 from 2015 to the current 2020 Code and respecting the more stringent requirements.

Hilton Tempo Hotel
Manhattan Beach, CAAXIS/GFA Architecture + Design
The Mechanical and Plumbing Engineering scope has completed the Schematic Phase and is moving in the Design Development Phase. The mechanical infrastructure is designed around LG Variable Refrigerant Flow fan coil units.

Marriott Tribute Hotel
San Pedro, CAAXIS/GFA Architecture + Design
The Mechanical and Plumbing Engineering scope is prepping for submitted to Los Angeles Department of Building and Safety for Plan Check. The mechanical infrastructure is designed around LG Variable Refrigerant Flow fan coil units. Learn More.